Final Project Archive
2014 Final Reports
2013 Final Reports
2012 Final Reports
2011 Final Reports (PDF)
2010 Final Reports (PDF)
- Pedestrian Safety on Kearny Street (PDF)
2013 Final Reports
- Food on Jackson Street
- Herbal Medicine in Chinatown (Video)
- Chinese Playground
2012 Final Reports
- Stockton Street Corridor Study. Report/Presentation
- Grant Avenue Corridor Study. Report/Presentation
- Kearny Street Corridor Study. Report/Presentation
2011 Final Reports (PDF)
- Innovation: Envisioning Improvements for Tomorrow
- Chinatown Block Study: Stockton, Powell, Jackson, and Washington
- Assessor's Block 225 Study: Sacramento, Clay, Stockton, and Grant
2010 Final Reports (PDF)
- Re-generation. A Chinatown Block Study: Kearny Street between Washington and Jackson
- Towards a Better Broadway. A Proposal to Improve Broadway Street between Stockton and Grant/Columbus
- Stockton Street Corridor Block Study